EMT Practice Test

1. Question Content...


Question List

Question1: What information is required when adding a new space within a facility to the ENERGY STAR Portfolio Manager?

Question2: For projects not eligible for the ENERGY STAR rating, the project team could demonstrate compliance with Energy and Atmosphere Prerequisite, Minimum Energy Efficiency Performance by

Question3: According to Indoor Environmental Quality Credit, Daylight and Quality Views, what is the view factor in the diagram below?

Question4: An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building's energy using systems is to

Question5: Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Question6: Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies requires a project building to employ permanent entryway systems. How long must the entryway system be in the primary direction of travel?

Question7: In which of the following ways can a campus project using a Group Approach comply with Water Efficiency Prerequisite, Building-Level Water Metering?

Question8: When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

Question9: In densely populated rooms, CO2 monitors must be located a minimum of how many feet (meters) above the floor?

Question10: Which product recycling requirement applies specifically to LEED AP Operations and Maintenance Schools and Hospitality?

Question11: The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)

Question12: Under Energy and Atmosphere Credit, Optimize Energy Performance, for buildings eligible to receive an energy performance rating using the Environmental Protection Agency's ENERGY STAR Portfolio Manager what is the minimum rating to receive points?

Question13: Innovation credits for exemplary performance are awarded for

Question14: The measures called out on the following site plan may contribute to the achievement of which LEED credits?
(Click on Exhibit)
Exhibit

Question15: What must the project team do in order to maximize the reduction in operational costs with regard to Sustainable Sites Credit, Site Improvement Plan?

Question16: A standard reference when creating an indoor air quality management program is

Question17: Presuming all water fixtures meet the LEED Operations and Maintenance Rating System requirements, which of the following statements is correct when considering baseline water usage in relation to water use?

Question18: What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Question19: The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

Question20: What is the allowed maximum tenant space exclusion for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

Question21: At what point is it appropriate for the LEED AP to administer an alternative transportation survey to those that visit the building?

Question22: For Materials and Resources Credit, Purchasing - Lamps, the threshold for mercury-containing lamps is

Question23: The project team has been directed by the building owner to only pursue practices that directly improve the actual building performance. Which of the following would be the lowest cost option?

Question24: A LEED AP performs several on-site reviews for LEED compliance and encounters the following scenarios.
Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?

Question25: To determine possible credit compliance for Energy and Atmosphere Credit, Advanced Energy Metering, what information needs to be verified?

Question26: Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?

Question27: In order to earn Indoor Environmental Quality Credit, Green Cleaning - Custodial Effectiveness Assessment, what is the highest APPA Leadership in Educational Facilities' Custodial Staffing Guidelines score a facility may achieve?

Question28: A manufacturing plant is increasing units produced and the number of employees annually. The building is documenting compliance with Energy and Atmosphere Prerequisite, Minimum Energy Performance, Case 2, Option 1. Path 2 Benchmark Against Typical Buildings Using Comparables. Which of the following should be used to normalize the building's energy use?

Question29: Which of the following is a feature of the ENERGY STAR Portfolio Manager?

Question30: Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources Credit, Solid Waste Management - Ongoing?

Question31: Which of the following is the most appropriate use of untreated stormwater?

Question32: Who needs to be surveyed for an in-patient hospital project for Location and Transportation Credit, Alternative Transportation: Option 1. Transportation Survey?

Question33: Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\

Question34: Which of the following strategies is allowed under Energy and Atmosphere Credit, Renewable Energy and Carbon Offsets, and will help a project achieve Energy and Atmosphere Credit, Optimize Energy Performance?

Question35: Rainwater harvesting can be used for which of the following credits or prerequisites?

Question36: Which of the following is a low impact development (LID) technique for rainwater management?

Question37: What percentage of individual occupant spaces must have individual lighting controls in projects seeking Option 1.
Lighting Control in Indoor Environmental Quality Credit, Interior Lighting?

Question38: A project is pursuing Materials and Resources Credit, Solid Waste Management - Facility Maintenance and Renovation. The project has generated the following waste as part of their Facility Maintenance and Renovation activities: 2,000 lbs. (907.2 kg) of steel, 900 lbs. (408.2 kg) of carpet, 1,100 lbs. (498.9 kg) of wood, and 1,500 lbs.
(680.4 kg) of wallboard. If the project has diverted 1,800 lbs. (816.4 kg) of steel, 900 lbs. (408.2 kg) of carpet,
1,000 lbs. (453.6 kg) of wood, and 250 lbs. (113.3 kg) of wallboard, what is the actual diversion rate achieved?

Question39: What is the percentage range of total municipal waste that commercial and institutional buildings typically account for?

Question40: An organization pursuing LEED O+M certification for their headquarters has a renovation policy that includes strict requirements around the selection of building products and requires contractors working in the building to develop a plan for the diversion of waste produced during renovation projects. What must the organization add to their renovation policy to meet the requirements of Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?

Question41: Discussing the project goals to help identify the credits and options that the team should attempt is an example of

Question42: Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use Reduction project teams will be able to

Question43: Which of the following topics is unnecessary in order to comply with the Sustainable Sites Credit, Site Improvement Plan?

Question44: The maximum number of points in the Innovation Category that can be achieved by exemplary performance is

Question45: A property manager is evaluating various bids from pest management services. Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?

Question46: Under Indoor Environmental Quality Credit, Interior Lighting, outlet powered task lighting contributes towards compliance for what category of building space?

Question47: In order for a project team to meet the requirements of Indoor Environmental Quality Credit, Integrated Pest Management, how much advanced notice to building occupants is needed after the emergency application of a pesticide other than the least toxic pesticide?